An exhibition housed in a modular hall system, making maximum use of prefabrication. It was designed so that installation and commissioning of the exhibition could be completed within 90 days of arriving on site. The acrylic components were optimized to use the manufacturer’s standard sheet sizes. The exhibition consists of a two-storey tunnel enclosed within a cylindrical tank.





